Sealand DTM04 Tank Monitor System Manual Uživatelský manuál Strana 10

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 72
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 9
10
Dometic Tank Monitor SystemInstallation
6.4 Key to DTM04 system wiring
(g.4,page3)
Ref. Description
A DTM04indicatorpanel
B Wastewater tank
C 12VDC
D 24VDC
E VDCground
F 1-amp circuit breaker or fuse
G Red
H Blue
I Black
J Green
K Yellow
L Orange
M Full level probe
4
Ref. Description
N Mid level probe
O Low/Emptylevelprobe
P 12or24VDC
Q Toilet system circuit breaker or fuse
R +VDCtoelectrictoiletsystem
S +VDCto“fulltank”monitor(optional)
Notes:
1. Heavy line indicates 14 gauge or larger stranded
copperwireisrequired.
2. Other wire can be 18 gauge stranded copper wire
or larger.
Caution!
Operator must know local regulations for emptying a holding tank.
Caution!
Do not install probe cap in fuel tank. NeverinstallDometicprobecapwithoatswitches
into a tank that contains anything other than waste water, grey water or fresh water.
6.3 Probe Cap (g.3B,page2)
1. Loosen compression nuts on adjustable probes and install probe cap into tank. Following
numbersprintedontopofprobecap,slidethe“1probe(g.3B4,page3)downuntilthe
oattouchesthebottomofthetank.Tighten“1”compressionnutandmarktheprobetubeat
the top of the nut. Do not cut the probe tube at this mark. Loosen the compression nut, slide
theprobeup,andcarefullycutthe“1”probetube42mm(1.625inches)belowthemarkwithout
damaging the wires inside the tube. Pull the wires through the black wire cover and push the
probe down into the compression nut until the black wire cover touches the compression nut.
Therecessedshoulderoftheoat,ortheletters“NO”,shouldbefacingdown(B5).
2. Removeprobecapfromtankandadjustthe“2probe(g.3B6,page3)forone-halffulllevel
for black or gray water tanks. Tighten the compression nut and cut the probe tube off 10 mm
(0.375inch)abovethecompressionnutwithoutdamagingthewires.Sliptheblackwirecover
ontothetopofthetube.Therecessedshoulderoftheoat,ortheletters“NO”,shouldbefacing
up(B7).
3. Route18-gaugestrandedcopperwiresfrommonitorpanelandDCgroundsourcetotheprobe
cap.Usequick-disconnectterminalsonoatswitchwirestopreventtwistingwireswhenremov-
ing the cap. With cap removed from tank, connect the wires according to the wiring diagram
(g.4,page3),turnonelectricalpowertosystem,andtesttheoatsbymovingthemupand
downandmonitoringtheDTM04panel.DisconnectthewiresandinstalltheprobecapandO-
ring into the tank. Reconnect the wires.
3
3
3
4
Zobrazit stránku 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 71 72

Komentáře k této Příručce

Žádné komentáře